    • Walter Lozano's avatar
      Extend RC testing period · 9b6be139
      Walter Lozano authored and Emanuele Aina's avatar Emanuele Aina committed
      
      Update the release schedule to extend the RC testing period to have
      enough time to run all the planned tests and still have some buffer
      to release and a new RC in case of a major issue. With this new
      schedule, RC testing period will be two weeks.
      
      This new release schedule does not affect the release date, which
      means that RC testing periods will overlap with different releases.
      
      Signed-off-by: default avatarWalter Lozano <walter.lozano@collabora.com>
      9b6be139
  8. May 04, 2022
  9. May 02, 2022
  10. Apr 26, 2022
  11. Apr 19, 2022
  12. Apr 12, 2022
  13. Apr 08, 2022
  14. Apr 06, 2022
  15. Apr 05, 2022
  16. Mar 25, 2022
  17. Mar 22, 2022
  18. Mar 18, 2022
  19. Mar 17, 2022
  20. Mar 15, 2022
  21. Mar 11, 2022
  22. Mar 10, 2022
  23. Mar 08, 2022
Loading