Wait for AUM log before continue testing
In some cases the logs for AUM restart are delayed causing false test failures. In order to avoid the issue, wait to the log before continue with the rest of the tests.
infrastructure/apertis-issues#217 (closed)
Signed-off-by: Walter Lozano walter.lozano@collabora.com
Edited by Walter Lozano
Merge request reports
Activity
Filter activity
mentioned in issue infrastructure/apertis-issues#217 (closed)
mentioned in merge request !47 (merged)
Please register or sign in to reply