Skip to content

Fix update manager automated report

The update manager tests report the different phases as aum-*-phase-[1..x]. This is does not cope with the qa reporting tool that expects a result with the same name than the test yaml definition. Let's consider the last phase of the test to be the final result. Any previous error would have been carried forward.

Signed-off-by: Frédéric Dalleau frederic.dalleau@collabora.com

Test job: https://lava.collabora.co.uk/scheduler/job/1557153

Edited by Frédéric Dalleau

Merge request reports

Loading