backport v2023dev1 -> v2022: gitlab-ci: Prepare for using the new job generator
This is part of the work in https://phabricator.apertis.org/T7900.
This is a backport of !474 (merged)
Depends on tests/apertis-test-cases!418 (merged)
Edited by Detlev Casanova
Merge request reports
Activity
@detlev I believe this one should land together with tests/apertis-test-cases!418 (merged), correct? In which case could you please update (e.g. remove WIP commit) and undraft this one?
mentioned in merge request tests/apertis-test-cases!418 (merged)
enabled an automatic merge when the pipeline for e70b1bff succeeds
Please register or sign in to reply