Skip to content
Snippets Groups Projects

Extend RC testing period

Merged Walter Lozano requested to merge wip/wlozano/release-schedule into master
All threads resolved!

Update the release schedule to extend the RC testing period to have enough time to run all the planned tests and still have some buffer to release a new RC in case of a major issue. With this new schedule, RC testing period will be two weeks.

This new release schedule does not affect the release date, which means that RC testing periods will overlap with different releases.

Signed-off-by: Walter Lozano walter.lozano@collabora.com

Edited by Andre Moreira Magalhaes

Merge request reports

Loading
Loading

Activity

Filter activity
  • Approvals
  • Assignees & reviewers
  • Comments (from bots)
  • Comments (from users)
  • Commits & branches
  • Edits
  • Labels
  • Lock status
  • Mentions
  • Merge request status
  • Tracking
Please register or sign in to reply
Loading