-
Walter Lozano authored
Since there was a delay in the release candidate for v2021.7 due to the perform the folding before the RC amend the release schedule accordingly. Signed-off-by: Walter Lozano <walter.lozano@collabora.com>
Since there was a delay in the release candidate for v2021.7 due to the
perform the folding before the RC amend the release schedule accordingly.
Signed-off-by: Walter Lozano <walter.lozano@collabora.com>